Import from a tracker
The import moves a team onto Andon from Trello, Jira, Linear or Asana in one go, with everything it has there: issues, sub-tasks, comments, files, statuses, people, sprints, versions and custom fields. You see a dry run of what it will make before anything changes, and you can run it again later: it updates what it made and never duplicates it. An Asana import can also stay in sync afterwards.
To bring in a few issues, or keep pulling a Linear backlog in as it grows, use the board’s Import button and Linear’s import rules instead: see Integrations.
Owners and admins run imports. The page is off Settings’ menu: search Settings for Import from a tracker, or open Settings → Connections, press Add beside Add a connection, and choose Import from a tracker, once.
Before you start
| Source | Reads from | What you need |
|---|---|---|
| Trello | the API, or the board’s JSON export | for the API, and to copy files, a Trello connection. Export: the board’s menu → Print, export and share → Export as JSON |
| Jira | the API, or an export file | for the API, a Jira connection. Export: CSV (all fields), or XML (Jira Server and Data Center) |
| Linear | the API | a Linear connection |
| Asana | the API | an Asana connection |
A Jira export names people by username, since it carries no email addresses. An XML export brings sprints with their dates; a CSV export brings sprints as labels. Jira writes 1,000 issues per XML export by default, and the import warns when the file is shorter than the search, so export the rest in more files.
Run an import
- Under New import, pick where it comes From: the source, and the board, project or team in it. For an export, choose the Export file.
- Press Read and plan. Andon reads the source once: an upload at once, an API source in the background. Nothing is made yet.
- Read the dry run: what the import will make and update, per kind (cards, sub-tasks, comments, files, links, statuses, projects, cycles, milestones, custom fields, templates, relations and former members). It changes as you change the choices below.
- Map it:
- Team: a new team named after the source, or one you have. A new team takes the source’s key when it’s free
(
ENGfor Linear’s ENG). - Statuses: each source status lands on one of the team’s statuses, matched by name, or on a new status. Ready is never offered: an import starts no run.
- People: each person is matched to a member by email, else by a unique name, or becomes a former member.
- Keys: The team’s numbers (
ENG-42becomesWEB-1), or the tracker’s numbers where they’re free in the team (ENG-42becomesWEB-42). Either way the old key keeps working in links, ⌘K and the CLI. - Epics (Jira): Projects of the team, or Parent cards.
- Checklists (Trello): Sub-tasks, or In the notes.
- Issue types (Jira): Labels, or Card templates, where each type (Bug, Story …) maps to one of the team’s card templates or a new empty one named after it.
- Archived items come archived, or not at all (the default). Copy files is on by default.
- Team: a new team named after the source, or one you have. A new team takes the source’s key when it’s free
(
- Press Import N cards, then Import to confirm. It runs on the server and the page shows progress; you can leave the page and it carries on. Cancel stops it after the card it is on.
- Read the report: what was made and updated, what failed and why, and what the source couldn’t give.
Run it again any time with Import again. It updates what it made only where nobody has changed it on the board since, and never moves a card: the board’s columns are the board’s. A card someone deleted on the board isn’t brought back.
What becomes what
| Trello | Jira | Linear | Andon |
|---|---|---|---|
| board | project | team | a team (a Trello board is also a project of it) |
| list | status | workflow state | a team status, on a column |
| card | issue | issue | a card, linked to its issue |
| checklist item | sub-task | sub-issue | a sub-task |
| label | label, issue type | label | labels (issue types: labels or card templates) |
| member | assignee, reporter | assignee, creator | the card’s owner, or its former assignee |
| comment | comment | comment, with threads | a comment, its date kept |
| attachment | attachment | upload, attachment | a file (copied) or a link |
| custom field | custom field | none | a custom field of the team |
| none | sprint | cycle | a cycle |
| none | fix version | project milestone | a milestone |
| none | story points | estimate | the estimate |
| none | epic | project | a project (Jira: or a parent card) |
| none | issue link | relation | blocks becomes a dependency; duplicates and relates become relations |
Priorities: Linear’s urgent, high, medium and low, and Jira’s highest to lowest, become urgent, high, low or none. Jira’s Medium, its default, is none.
With Card templates for issue types, each card is filled from its type’s template once: the issue’s own values win, the template fills what the issue left empty, adds its labels and notes, and makes its sub-tasks.
Asana
Asana reads through its API. From lists the teams the connection can see, by workspace (a workspace without teams is read whole). A team is read whole, or press Pick projects to choose some (up to 200).
Asana has no bulk read, so a team takes a while: about half an hour for 2,000 tasks. What it maps to:
| Asana | Andon |
|---|---|
| team (or the workspace, when it has none) | a team; it has no key, so one is suggested from its name |
| project | a project, with its status and dates |
| section | a status, one per name across the team’s projects, on a column guessed from its name (“In progress” → Working, “In review” → Review, “Done” → Done, “Backlog” → Backlog, else Next) |
| task | a card in its first project; a task in two projects comes once |
| subtask, at any depth | a sub-task |
| completed | Done |
| milestone task | a milestone of its project |
| approval task | a card of type Approval |
| tag | a label |
| Priority field | the priority |
| Story points, Points or Estimate field | the estimate |
| other custom fields | custom fields |
| comment | a comment; Asana’s system stories (assigned, moved …) are dropped |
| attachment | Asana’s own files are copied; Drive, Dropbox and Box links stay links |
| dependency | a dependency |
Not brought over: portfolios, goals, likes, time tracking, and an approval’s approved or rejected state beyond being completed.
Keep an Asana import in sync
A finished Asana import has Keep in sync with Asana. Turn it on, and Asana’s changes reach the board as they happen: titles, notes, priority, estimate, due date, labels and fields where nobody changed them on the board, new comments and files, sub-tasks and dependencies. A new task becomes a new card in the Backlog. A card never moves column because of the sync.
- Asana must reach your board at a public https address.
- At most 50 of the import’s projects are synced. A project Asana refused shows Failed with Asana’s reason; turn sync off and on to try again.
- Not synced: a task deleted in Asana (its card stays), and renamed sections or projects.
- Turning it off removes the subscriptions at Asana.
The other direction, the board’s changes going back to Asana, is the Asana connection’s write-back. With both on, a task and its card stay in step both ways. How the sync is doing is under Asana sync health.
People who aren’t on the board yet
Anyone the tracker names who isn’t a member becomes a former member: their name shows on the cards and comments they had, and their email stays private.
Owners and admins can Invite a former member the tracker gave an email for (from the report, the People mapping, or Settings → Workspace → People → People from imports), and link one to an existing member whose address differs. See People and roles.
Limits and files
- Up to 10,000 issues, 500 comments and 50 files an issue; the report names what was left out.
- Files are copied up to 25 MB each, only from the tracker’s own hosts. A bigger one, or one elsewhere (a Jira Server’s files in an XML export), stays a link, and the dry run counts it as one. A failed download is named in the report and tried again on the next run.
- Without a Trello connection, a Trello export’s files come as links.
- Imported cards never start a run, and recipe picking isn’t asked for each one.
- Every import is in the audit log.
See also
- Integrations: connections, write-back and importing a few issues at a time.
- Integrations internals: how the import job runs.